errata

While I do everything possible to ensure that my patterns contain no errors, sometimes they manage to sneak past me and my tech editor. Corrections for those errors can be found below.

-

ELAM

Version 1 of this pattern (versions downloaded prior to October 28, 2014) had a mistake in Round 6 of the crown decrease section. This round should read:

Rnd 6: [P1, k1, s2kp2, k1] around. 40 sts remain.

This correction has been made in version 2 of the pattern.

-

ELSKLING

Version 1 of this pattern (versions downloaded prior to August 3, 2015) had a mistake in Row 1 (Decrease row) of the second section of the Raglan Shaping. This row should read:

Row 1 (Decrease row): *K1, k2tog, k to 3 sts before m, ssk, k1, sm, k to Lace Panel, work Lace Panel sts, k to m, sm. Rep from * once more, then k1, k2tog, k to last 3 sts, ssk, k1. 6 sts decreased.

The "k2tog" in bold text was originally missing. This correction has been made in version 1.1 of the pattern.

-

MOON PULLS

January 16th, 2014: One correction for the Raglan Shaping section (page 5 of pdf): the needle size listed for the Set-Up Round should be Size A, not Size B 

-

PINE BOUGH COWL

Where the pattern reads:

Rep Chart A, Chart B and Stripe Section 2 three times for a total of four times.

This incorrectly omits Stripe Section 1, and so it should read:

Rep Chart A, Stripe Section 1, Chart B, and Stripe Section 2 three times for a total of four times.